Energy renovation
Energy renovation with French MaPrimeRénov' scheme
Insulation, heat pump, windows: a MaPrimeRénov' delegate manages grants, advances the bonus and selects certified RGE contractors.
F/G rated homes are progressively banned from rental (Climate law). Our MaPrimeRénov' delegate partners advance the bonus, handle the file and select certified RGE contractors. Free quote within 48h.
Why use a MaPrimeRénov' delegate?
- MaPrimeRénov' and CEE advance (no cash upfront)
- Selected RGE QualiPAC, Qualibat, QualiENR contractors
- Full Anah + CEE file management
- 10-year warranty required by the delegate
- Energy audit included for global renovations
Launch my renovation project
Frequently asked questions
- Which works are MaPrimeRénov' eligible?
- Insulation (attic, walls, floors), heating replacement (heat pump, biomass boiler), ventilation, energy audit, global renovation (bonus rate).
- How much can I receive?
- MaPrimeRénov' ranges from €2,000 (high-income) to €35,000 (very low income, global renovation). Stackable with CEE and eco-PTZ.
- When will F and G classes be banned from rental?
- Class G banned since January 1, 2025 (new or renewed lease). F banned in 2028, E in 2034.
- Why use a delegate?
- They advance MaPrimeRénov' and CEE (you only pay your net amount), coordinate RGE contractors, and deduct the bonus from the final invoice — no cash advance.
- How long do MaPrimeRénov' renovations take?
- By nature: attic insulation 1-3 days, exterior wall insulation (ITE) 2-4 weeks, heat pump 2-5 days, full renovation 3-6 months. Timeline also includes grant file (4-8 weeks of Anah validation before start), often managed in parallel by the delegate.
- Must I be owner-occupier to qualify?
- No: MaPrimeRénov' Landlord exists (since 2021) with €35,000/unit cap and 6-year minimum rental commitment (capped rent in tense zones). More restrictive than Occupier MPR but available regardless of income. Essential to prepare for F-class ban (2028) and G-class (in force since 2025).
- Has MaPrimeRénov' changed recently?
- Yes, two major changes in 2025-2026: (1) full renovations require prior audit + 2 minimum actions + 2-class DPE jump; (2) single-action remains eligible with adjusted amounts. Check current rates on france-renov.gouv.fr — a delegate guides you to the optimal pathway.
- How is renovation quality controlled?
- Mandatory post-renovation audit (full renovation) by an approved auditor, checking compliance with recommendations. For single actions: no mandatory audit but the delegate usually does visual + invoice checks. Anah audits 1 in 50 files (random control).
- Can I combine multiple grants (MPR + CEE + eco-PTZ)?
- Yes: MPR (subsidy) + CEE (energy bonus, income-independent) + eco-PTZ (0% loan up to €50,000). Cumulative cap: 90% of total cost for very-low income, 75% low, 60% intermediate, 40% high. The delegate calculates the optimization.
- Which materials/equipment qualify for the grant?
- List set by decree: insulation (attic, floors, walls inside/outside), heating (air/geothermal heat pump, biomass boiler, wood stove, thermodynamic/solar water heater), ventilation (dual-flow), energy audit. Contractors must be RGE-certified for the matching qualification (QualiPAC, Qualibat, QualiENR).